West of US-41, North of Estero Parkway
The project immediately impacting the Breckenridge community is Eich Properties' commercial development (also known as the medical office and day care project). It is located at 19950 South Tamiami Trail, directly south of the main entrance to Breckenridge along US-41.
The 4.2-acre parcel is being developed into a professional commercial and medical plaza. It features an existing day care center managed by Milestones Learning Center designed to accommodate up to 167 students in six classrooms. Operating hours are 6:30 a.m. to 6:30 p.m.
A 70,000-square-foot, three-story professional medical office building will anchor the corner. Following extensive neighborhood meetings between the developers and the Breckenridge Board to resolve direct drainage and privacy concerns, the Village approved the application. Approval came with strict stipulations requiring an 8-foot-tall visual buffer wall and dense structural landscaping to stand between the new commercial buildings and the Breckenridge property line.
Comprehensive site restructuring is required to route stormwater away from Breckenridge.
Various traffic safeguards have been implemented, including:
- Traffic entering and leaving the 4.2-acre commercial site directly from U.S. 41 (Tamiami Trail) is strictly restricted to right-in and right-out turns only. No direct left turns or median cuts will be permitted across US-41 at this point.
- Cross-Access Links: To prevent bottlenecks on the main highway, the developer must build internal cross-access connections linking the property to established commercial plazas located directly to the north and south.
- Crosswalk Infrastructure: Multiple pedestrian crosswalks and dedicated stop signs are required inside the development to slow down vehicles maneuvering near the daycare playground area.
- No Breckenridge Cut-Throughs: All traffic patterns must be contained within the commercial parcel bounds. The layout explicitly blocks commercial or daycare drop-off traffic from using Breckenridge's residential entrance infrastructure for U-turns or cut-through driving


